Assign items to members

TimeTracker NX 7 New!!!

Overview

You can assign items based on the person in charge.
The load of the person in charge is displayed in real time, so you can change the assignment to another person in charge and level the load.
The allocation results are also reflected in the Gantt chart.

Understand the progress of the project and assign the optimal resources to improve productivity.

The functions introduced on this page are used when loading resources within a project.

If you want to adjust resource allocation across multiple projects, please refer to the following page.
"Adjusting member allocation across projects"

Display view

Click the following button on the work item screen.

The following pop-up window will be displayed.

  • ①: User to be assigned
  • ②: Total planned man-hours assigned to the target user for that day
  • ③: Assigned item

Displayed information

  • Displays end items (items with no child items).
    Double-click an item to display the target item in the Gantt table.
  • The displayed number is the planned effort for each item, averaged over the period.
    If you do not want to average the value over the period, add a child item and enter the period and planned effort.

Here are the operations that can be performed using the menu displayed on the resource setting screen.

The buttons correspond to the following.

TargetButton contentWhat you can achieve
Edit users to which resources are assignedYou can add/remove/sort users to be displayed in the resource planner.
Display toggle for items assigned to resourcesYou can display/hide all items assigned to resources.
Select the period to open the resource plannerÅE If you select "X weeks from now" or "X weeks before and after", the display will start from the current day.
ÅE You can also display the period of the item selected in the side navigation selection.
ÅE If you check "Fix display period", it will display the period last time it was opened.
ÅE The direction of the arrow indicates the selected period.
Show completed itemsToggle display/hide of completed items.
Hide them if you want to check future plans and loads.
Show items not subject to progress managementToggle display/hide of items not subject to progress management.
Display them if you want to assign planned man-hours and resources and check the load.
Show actual load up to yesterdayDisplays the actual load (actual times).
Show resource load within the project onlyDoes not display man-hours for items assigned in other projects.
There is no need to distinguish the target of the change, but please decide on the resource allocation with other projects in advance before operating.
Switch display itemsÅEDisplays all milestones in the target project.
Å@Assign resources using milestones as a guide.
ÅEDisplays items to which no one is assigned.
ZoomEnlarges/reduces the display.
RefreshRefreshes the display. Click if the operations you have performed on the Gantt chart are not reflected.
Other settingsÅEDisplays side-by-side with the Gantt chart.
ÅESets the threshold for displaying by color.

Change resource allocation

Information required for view display

The following items created in the Gantt chart are displayed as ① to ④.

  • Start date/end date
  • Resource allocation
  • ② (If there is no date):
    It will be displayed as unplanned in the resource column. Set the period by dragging and dropping.
  • ④ (When there is no date or resource assignment):
    It will not be displayed in the resource planner. Please set either one in the Gantt table.

Change assignment

First, select the user to be changed from "Edit resource assigned users".
You can change the assignment by the following operations.

What to doOperationResult of operation
Change assignmentDrag and drop the target item to the destination resource.The assignment will change.
Delete assignmentRight-click the target item with the target item selected and select "Remove assignment".The assignment will be deleted.
Reduce assigned labor hoursClick both ends of the item to change the period.The planned ltimes for one day will decrease by the amount of the extended period.
Hold down the "Ctrl" button and drag the item and drop it on another resource.Divide the dropped resource and the planned labor in half.
Change assignment dateClick the item and move the date.The load will be calculated on the date after the move.
If a user drops a resource from another user to a user who has already been assigned the resource, the planned man-hours will be added.

Notes

  • Even if you change the item period in the Resource Planner, subsequent items that are linked in the Gantt chart will not be affected.
    Change the period of subsequent items in the Gantt chart.

  • If you change the period of an item, it will also affect the load of other users assigned to the same item.
    If you hover your mouse over the item, the following image will be displayed, so check the users that will be affected.